From Signed to Paid: Closing the Gap Between the Sale and the Money
The gap between signed and paid is a list of jobs waiting on someone. Seven stages, the check at each one, and a weekly meeting that finds the stuck money.

A signature feels like the finish line. For the business, it is the start of a second race: the job still has to be accepted, scheduled, built, closed out, invoiced and paid. Money gets stuck between those steps, and often not because a homeowner refuses to pay. It gets stuck because nobody owns the next step.
The short version: split the time from signed to paid into seven stages, write down what "done" means for each one, give every job one owner per stage, and hold a 20 minute meeting each week that walks the jobs stuck between stages.
This is general information, not legal advice. Contract terms, lien rules and collection rules differ by state. Ask a lawyer about your own contracts and invoices.
The seven stages, and what done means
- Signed. Done when the signed contract, the chosen option and any notes from the table are in the job file within one business day.
- Accepted. Done when operations has checked the file and said yes, or sent back a list of missing facts.
- Scheduled. Done when the crew lead has confirmed a date and the homeowner has heard it. A date the homeowner asked for is not a scheduled date.
- Built. Done when the crew marks the work finished and uploads completion photos.
- Closed out. Done when the final walkthrough is held, the punch list is empty or has an owner and a date for each item, and any final inspection is passed.
- Invoiced. Done when the final invoice has gone to the right payer.
- Paid. Done when the payment is recorded and the balance is zero.
Put these names on your job board in this order. When a job sits in one stage too long, everyone can see which stage, and whose turn it is.
The signed scope check
Before operations accepts a job, someone checks the file against this list:
- the signed contract and the option the homeowner chose,
- every change agreed at the table, in writing,
- the deposit, if your contract calls for one, and whether it is recorded,
- the payer: the homeowner, a lender, an insurance claim or a mix,
- any date the homeowner asked for, marked as a request,
- access notes: gate codes, pets, parking, who will be home,
- permit or association approval needs, and
- the salesperson's open promises, such as "we'll match the gutter color".
Anything missing goes back to the salesperson with a deadline, not into a group chat. The sales to production guide has a fuller handoff list, and the three option guide shows how to make the chosen option obvious on the page.
Requested dates and confirmed dates
A date is the easiest promise to break. The salesperson hears "we need it done before the family visits", writes it down as the install date, and the crew never agreed to it.
Fix it with two fields and one sentence. The file has a requested date and a confirmed date, and only the scheduler fills in the second. The salesperson says:
"You'd like it done before the 20th. I've passed that to our scheduler, and they'll call you by Thursday with a confirmed date."
Then the scheduler calls by Thursday, even if the answer is "the 20th won't work, here is the closest date we can do".
Change orders before the work, not after
A change after signing is where scope and money drift apart. Use one rule: no change gets built until it is written down, priced and signed. A change order needs four lines:
- what changes, in plain words,
- the price effect, even if it is zero,
- the schedule effect, even if it is none, and
- the homeowner's signature and the date.
The invoice later pulls from the signed contract plus the signed change orders, and nothing else. If a crew lead agrees to a change on site, they call the office before they start it.
Close out the job on the day
A job that is finished but never closed out is a late payment waiting to happen. On the last day on site:
- take completion photos of every area you touched,
- walk the job with the homeowner and write down anything they point out,
- give each punch list item an owner and a date,
- hand over warranty papers and care instructions, and
- book the final inspection if the permit needs one.
The final walkthrough is also the right moment to explain how to reach you later and to invite a review, the same way for every customer. The reviews guide covers the wording.
The invoice check
Before the final invoice goes out, check five things:
- It matches the signed option.
- It includes every signed change order, and only those.
- It credits every deposit and payment already recorded.
- It goes to the right payer. On an insurance job, the check may be made out to more than one party; the insurance claims guide covers the two checks.
- Its due date and terms match your contract.
Send it the day the job is closed out. An invoice that waits a week for someone to type it is a week of cash you chose to wait for.
The weekly money meeting
Once a week, the owner or office manager, operations and sales meet for 20 minutes. Pull five lists:
- Signed, not accepted for more than two business days.
- Accepted, not scheduled.
- Built, not closed out.
- Closed out, not invoiced.
- Invoiced, not paid, sorted by how many days since the invoice went out.
For each job on a list, say one name and one next step out loud: "Dana calls the lender Tuesday for the funding date." Write it down. Next week, start with last week's names. Jobs that show up two weeks running get the owner's attention.
Follow up on a payment without a fight
Use the channel the homeowner agreed to, and keep it plain:
- The day the invoice goes out: "Your final invoice for the roof is attached. Thanks again for choosing us. Any questions on it, reply here."
- A few days after the due date: "Checking that you got the final invoice for the roof. Happy to walk through any line on it."
- After that, a call from the person who knows the job. Ask whether anything about the work is holding up payment. Often there is a punch list item nobody finished.
If a payment is disputed or very late, stop the reminders and talk to your lawyer about next steps before anyone sends anything sharper.
Commissions follow the same stages
If a rep's commission depends on the install or the final payment, the rep needs to see the job's stage without calling the office. Write down which stage moves each commission from pending to earned under your plan, and show reps that view. The commission plan guide covers how to set those rules so reps trust them, and the automations guide shows how to turn a stage change into a task for the next owner.
Signed to paid in GameForce
On select plans, sold deals turn into jobs: schedule the crew, track every stage, and let the homeowner watch progress in their own portal.
Send the invoice, record the payment and track your reps' commissions from the same place.
Whatever tool you use, the test is simple: can you pull the five lists above in under a minute, without a spreadsheet? The one login guide has twelve more tests.
FAQ
When should a contractor send the final invoice?
The day the job is closed out: work done, walkthrough held, punch list owned and photos in the file. Waiting for a weekly billing day only delays the money.
What should a change order include?
What changes, the price effect, the schedule effect and the homeowner's signature with the date. Get it signed before the extra work starts.
How do I find jobs that are done but not paid?
Track seven stages and pull the gaps each week: built but not closed out, closed out but not invoiced, and invoiced but not paid. Each stuck job gets a name and a next step.
Should reps see the status of their jobs?
Yes. When reps can see each job's stage and their commission status, they stop calling the office to ask, and they notice stuck jobs early.